Ten practical guides covering coating weights, standards, mill test certificates, tolerances, HS classification and container loading. Written from the mill side, so you get the specification a mill actually needs — and the arguments you avoid having at inspection.
Most steel import problems are not supply problems. They are specification problems — a coating weight quoted without a minimum, a standard named without the grade, a certificate type that was never agreed, or a tolerance clause that says "normal mill tolerance" and therefore means nothing.
These guides cover the decisions buyers actually have to get right, with the numbers and the standard references behind each one. Every table can be checked against the published standard, and every figure traces back to a conversion or a test rather than to a rule of thumb.
Which coating weight to specify — G and Z designations, full conversion table, ISO 9223 corrosion classes.
Read guide Coating selectionZinc versus zinc-aluminium: coating composition, salt spray performance, service life and cost.
Read guide Pre-painted coilPE, HDP and PVDF systems compared, nominal versus total DFT, colour matching and formability.
Read guide Roofing & claddingGI, PPGI, galvalume and aluminium compared across hot-humid, desert, coastal and temperate zones.
Read guide Seamless pipeGrade ranges, testing requirements, pipe marking and which standard to specify by project type.
Read guide Quality & inspectionEN 10204 3.1 versus 3.2, what each section proves, and a verification checklist to run on receipt.
Read guide StandardsA cross-reference table so one purchase order can be read across three numbering systems.
Read guide SpecificationsThickness, width, flatness and edge condition tolerances, and how to write an enforceable clause.
Read guide LogisticsHS classification for coil, full-cube stowage planning and the customs document set.
Read guide LogisticsCalculate coil weight from dimensions, convert to container payload and plan the stowage.
Read guideEach guide cross-links to the products it covers, so you can move from a technical question straight to a specification sheet and a quote.
Send grade, thickness, width, coating and quantity. We confirm mill availability and return a proforma with the applicable standard and delivery window — normally within one business day.