Pre-painted steel coil fails in one of two ways: the coating is too thin to survive the forming process, or it is thick enough to survive but too soft to survive the weather. Both failures start with a specification that quoted a colour number and a nominal thickness without defining the paint system. This guide sets out how paint build-up is specified, what each system actually delivers, and how to specify a PPGI coil that will still look good in five years.
These are the systems a mill will normally offer, and the differences are not cosmetic — they determine the service life and the price:
| Coating system | Typical total DFT | Cost position | Suitable exposure | Expected colour life | Main limitation |
|---|---|---|---|---|---|
| PE — Polyester | ~16–22 µm total | Standard economy | Indoor use, mild climates, short service life | 1–5 years | Colour retention degrades faster, chalk-prone |
| HDP — High Durability Polyester | ~24–30 µm total | Mid-range, most specified | Coastal, humid, moderate industrial | 8–15 years | Better colour retention and chalking resistance |
| PVDF — Polyvinylidene Fluoride | ~35–40 µm total | Premium, best colour retention | Severe coastal, desert UV, high-profile buildings | 15–25 years | Highest cost, limited colour range, requires clean handling |
| HDPE — High Durability Polyester (2-coat) | ~32–38 µm total | Premium polyester | Aggressive UV and industrial exposure | 12–20 years | Better than single-coat HDP at lower cost than PVDF |
This is the single most misunderstood item in pre-painted coil specifications, and it causes arguments at inspection more often than any other. Four terms have to be kept straight:
| Term | What it means | Why it matters |
|---|---|---|
| Nominal thickness | The coating system thickness quoted in the system name | What the mill is paid to apply |
| Total dry film thickness (DFT) | Nominal thickness plus the base steel tolerance contribution | What you should specify and what the certificate reports |
| Minimum DFT | The lowest acceptable measured value | The number that decides acceptance or rejection |
| Paint build-up effect | How much the base steel tolerance adds to the coating | Thicker substrate tolerance produces a heavier coat than nominal |
The practical rule: specify a minimum total dry film thickness. If your specification only quotes the nominal system thickness, the mill has room to argue that it supplied exactly what was ordered even when the measured value sits below your real requirement.
The coat is applied between two rolls set for a target gap. The base steel thickness varies within its own tolerance, so the wet film varies with it. On a 0.50 mm base with a ±0.05 mm tolerance, the measured total DFT varies by roughly 7 µm across the sheet. This is small in absolute terms and decisive in commercial terms when the specification carries a minimum DFT and the mill has targeted the nominal figure.
The practical consequence for a buyer is that you should specify the minimum total DFT, and you should accept that the mill will supply to that minimum rather than to the nominal. Any mill worth working with will state the paint build-up effect openly. We specify minimum DFT on all pre-painted coil orders for exactly this reason.
One practical note on colour matching: a colour reference is only meaningful against a physical standard. Screen colour names vary between mills and even between offices. The mill will normally supply an approved sample from the actual production run, and that sample becomes the reference. Where the project carries a brand or architectural standard, a spectrophotometer reading is the only reliable specification.
Pre-painted coil is designed to be formed after coating, but the coating has to be specified as formable. Two requirements matter: a bend test, which is part of the coating standard and confirms the coating does not crack under the specified bend radius, and a forming temperature range, because paint becomes brittle as it cools. Forming a coil below the specified temperature is the most common cause of coating cracks that appear weeks later at the customer's installation.
For reverse-side protection, specify oiled, passivated and oiled, or interleaf. Bare reverse sheets are for immediate processing only and will develop red rust within days in a humid climate.
Put these six items together and the order is unambiguous to any mill:
With that specification, the mill cannot deliver something that will fail. For base material selection, see our galvanized versus galvalume comparison, and for the exposure logic behind the coating choice, see roofing material selection by climate.
Nominal thickness is the coating system thickness in its name — a 25 µm PE system means 25 µm of paint. Total dry film thickness adds the contribution of the base steel tolerance. Because the base steel is coated while it still carries its thickness variation, the same paint system applied to a base with a ±0.05 mm tolerance produces a visibly and measurably heavier coat at the thick end. This is why mills and buyers disagree about whether a coil meets a 25 µm minimum: one is measuring the paint, the other is measuring the system. Specify minimum total DFT and the ambiguity disappears.
For coastal or marine-adjacent exposure, high durability polyester with a minimum total DFT of 32 µm, or PVDF at 35 µm if the colour must stay stable over fifteen years or more. Single-coat PE at 20 µm will chalk noticeably within two to three years in a salt-laden atmosphere and is not appropriate for this exposure class. Galvalume base under a HDP or PVDF system gives better corrosion resistance than galvanized base because the aluminium-zinc layer protects the cut edge and the paint protects the surface — the two mechanisms are complementary.
Give a RAL or SSAB colour reference plus the gloss level (typically 30–40% gloss for building sheet). RAL is the European convention and is the most widely specified for export orders. A colour name without a number — "RAL 9010 white" is fine, "special white" is not — cannot be matched reliably. The mill will supply a colour sample for approval against a physical standard before production, and that sample is the contract reference. Where the project has a specific brand colour, use a spectrophotometer reading rather than a chip.
Yes, and it is routinely roll-formed into profiled sheet after coating. What matters is that the paint system is specified as formable — bend tests and reverse bending tests are part of the standard, and the paint must not crack. Specify the bend test requirement on the order. Forming at low temperature makes the coating brittle, so forming temperature is also worth specifying. Pre-painted coil is normally supplied passivated and oiled on the reverse so it does not scratch against itself in the coil.
The coating is applied by roll coater to a moving web, and the gap between the two rolls is set for a target thickness. The base steel thickness varies within its tolerance band, so the wet film laid down varies accordingly. In practice, on a 0.50 mm base with a ±0.05 mm tolerance, the measured total DFT varies by roughly 7 µm across the sheet. That is enough to move a coil from marginally above a 25 µm minimum to marginally below it, which is why the paint build-up effect has to be accounted for in the specification rather than discovered at inspection.
Specify three things together and you will not have a problem: a coating system (PE, HDP, HDPE or PVDF) with a minimum total DFT, a colour reference with a gloss value, and a formability requirement including a bend test and a forming temperature range. Add the surface treatment state — bare, oiled, or passivated and oiled — and the reverse side protection if the coil will be stored in an open yard. That is a complete specification, and it removes the two most common failure causes: coating that cracks at the roll former, and colour that fades because the wrong system was specified for the UV load.
Send grade, thickness, width, coating and quantity. We confirm mill availability and return a proforma with the applicable standard and delivery window — normally within one business day.