How to read a mill test certificate: EN 10204 3.1 vs 3.2

The Mill Test Certificate is the single document a steel buyer checks first, and the difference between EN 10204 type 3.1 and type 3.2 is the difference between a mill declaration and an independently witnessed inspection. Most buyers do not know which one their purchase order actually requires until the cargo is at the port and the inspection agency asks for it. This guide explains what each section of the certificate means, what to verify on receipt, and the four clauses that most often cause a shipment to be held.

The three certificate types and what each proves

EN 10204 classifies inspection documents into three types. The distinction is not academic — it determines who is standing behind the numbers when a buyer's engineer asks whether the material in front of them is what was ordered.

Certificate type What it is Who takes responsibility When it is used
Type 2.1 / 2.2Test report based on the works test resultsMill self-declaration, no third partyRoutine commercial orders, low risk
Type 3.1Inspection certificate, independently verified by a third-party inspection bodyBody audits the mill's certificate against its own witness recordsMost export contracts, oil & gas, structural
Type 3.2Inspection certificate, third party witnesses and takes responsibility for the testBody present at testing, signs for the results directlyCritical service, sour/offshore, project-specified

The practical question for a buyer is simple: what does your purchase specification and your end client require? Written as "EN 10204 3.1" and written as "mill certificate" are very different instructions to a mill, and the difference in cost and lead time is real. If the specification does not say, ask your client before the mill does — a certificate type change partway through production costs more than a week.

What each section of the certificate contains

A complete inspection certificate has more sections than most buyers ever read. These are the ones that carry real commercial weight:

Section What it contains Why it matters
Heat numberMust match the marking on the material and the packing listThe link between certificate and physical steel
Chemical analysisC, Si, Mn, P, S, plus alloy elements if anyGrade identity — this is where a substituted grade gets caught
Mechanical propertiesYield strength, tensile strength, elongation, Charpy values where applicableConfirms the grade actually meets the standard
Dimensions and weightThickness, width, length, piece weight, total weightBasis for your weight-based payment and for customs
Surface condition / coatingEdge condition, passivation, oiled or bare, coating weight for coated materialThe four clauses that most often hold up a shipment

The four clauses that most often hold up a shipment

Across the shipments we handle, the same four issues recur, and in every case they are visible on the certificate before the cargo sails if somebody checks:

  • Coating weight below the specified minimum. The standard permits a tolerance, and mills sometimes deliver at the bottom of the band. If your specification requires a minimum total coating weight, the certificate value is the number that matters — see how G and Z coating weights convert.
  • Edge condition. Slit and sheared edges that are damaged will produce strip breaks at the customer's line. Rough edges on a coil ordered for slitting are a legitimate rejection, and inspectors do reject them.
  • Passivation and oiling. If the coil is going into a paint line, passivation and oil must be specified and must appear on the certificate. Chrome-free passivation is the current norm for European-bound material.
  • Weight reconciliation. Piece weight, number of pieces and total weight must agree. A mismatch of more than a few tenths of a percent between the certificate, the packing list and the bill of lading draws attention at customs and slows clearance.

All four are cheaper to fix before loading than after arrival. This is why we issue the certificate for review before shipment on request — the inspection is more useful before the cargo leaves than after.

A verification checklist to run on receipt

When the container is opened, before the steel is put into production:

  • Take three to five coils at random from different positions in the container, not from the easiest stack position.
  • Read the heat number marked on each coil and confirm it appears on the certificate index.
  • Cross-check the heat number against the packing list and against the bill of lading.
  • For coated material, compare the certificate coating weight against your specified minimum.
  • Check edge condition under daylight, particularly on slit edges.
  • Measure one or two thicknesses with a micrometer if the tolerance is critical to your line — the certificate tells you what was measured at the mill, your gauge tells you what arrived.
  • Photograph the container interior, the stowage and the coil markings before unloading begins.

Photographs taken at discharge are also your evidence for any subsequent claim, which is why we shoot loading photographs and video as standard and can make them available before loading completes.

Common questions about certificates

For how the certificate type affects what a pipe order needs, see API 5L versus ASTM A106. For the standard numbering differences between mills that quote ASTM, EN and JIS, see our standards cross-reference.

Frequently asked questions

What is the difference between an MTC 3.1 and a 3.2 certificate?

Both are inspection certificates under EN 10204. The difference is who takes responsibility for the test results. In a 3.1 certificate, an accredited third-party inspection body reviews the mill's own test results and its own witnessing records, and issues the certificate against the mill's declaration. In a 3.2 certificate, the inspection body witnesses the tests itself and takes direct responsibility for the reported values. For most structural and general industrial shipments a 3.1 certificate is entirely normal. For sour service, offshore and API 5L PSL2 pipeline projects, 3.2 is normally mandatory because the certificate is what carries the impact test results.

Can I use an MTC issued by the mill itself?

A mill-issued document is a type 2.1 or 2.2 document — a test report based on the works test results. It is perfectly valid for many contracts and buyers accept it. But it is a declaration by the party that sold you the material, with no independent check. If your purchase specification calls for EN 10204 3.1 or 3.2, a type 2.1 document does not satisfy it, and the inspection agency will say so at the port rather than at the mill. Specify the certificate type on the order, and specify the inspection body by name where you want 3.2.

Which four clauses most often hold up a steel shipment?

In our experience the recurring ones are: coating weight on coated material not meeting the specified minimum; edge condition showing damage or poor shearing; passivation or oiling missing when the material is going into a paint line or food-contact application; and the weight per piece not reconciling with the declared total weight for customs valuation. All four are visible on the certificate before shipment if someone on the buyer's side reads it, and all four are far cheaper to fix before loading than after arrival.

Should the MTC be in English?

Yes, and this is worth being explicit about. Certificates issued in Chinese or with a mill's own bilingual format are accepted by most inspection agencies after translation, but the translation step adds days and creates a document that differs from the original. We issue certificates in English with the Chinese original retained on file, and we can pre-agree the format with your inspection body before production rather than after the vessel has sailed.

How many individual certificates do I get for a coil shipment?

One certificate per heat, not per coil. A coil shipment normally involves several heats, so expect several certificates, cross-referenced to a packing list that shows which heat maps to which coil. The important thing is that every coil in the shipment is covered by a certificate and that the heat number on the physical marking matches. We issue a consolidated index so the mapping is done for you rather than left to whoever opens the container.

Does the MTC include the coating weight I need?

For hot-dip galvanized and pre-painted coil it should. The coating weight must appear as an actual measured value, not just the nominal grade, because the standard permits a tolerance band and the mill certifies what was actually applied. If your specification states a minimum total coating weight in g/m², the certificate value is what is checked. See our guide on G60 versus G90 coating weights for what the numbers mean.

Need help specifying your material?

Send grade, thickness, width, coating and quantity. We confirm mill availability and return a proforma with the applicable standard and delivery window — normally within one business day.

Request a Quote