Steel coil weight and packing calculation

Coil weight is not a detail to be settled after the order is placed — it determines whether the coil fits your uncoiler mandrel, whether your slitting line can handle the payload, and how many coils fit in a container. It is also the single most common source of disagreement at the loading scale. This guide gives you the formulas, the standard weight bands, and the loading arithmetic so you can verify a mill weight certificate before the shipment leaves.

The formulas

Three formulas cover almost every situation in steel coil procurement. Use the geometry formula when the mill quotes a coil by outer diameter, the strip formula as a quick sanity check, and the loading formula when planning a container.

Coil weight from coil geometry
W (kg) = (π ÷ 4) × (OD² − ID²) × Width(m) × 7,850 OD and ID in metres, width in metres, density 7,850 kg/m³. This is the formula to use when the mill quotes a coil by its outer diameter.
Weight per metre of strip
W (kg/m) = Thickness(mm) × Width(mm) × 7.85 ÷ 1000 The fastest check on a coil. Multiply by the strip length for the total weight.
Strip length from coil geometry
L (m) = π × (OD² − ID²) ÷ (4 × Thickness(m)) OD and ID in metres, thickness in metres. Useful for confirming how much strip is on a coil before cutting it.
Container loading by weight
Coils = Container payload ÷ Actual coil weight Always use the weighed coil weight from the packing list, never the calculated estimate. Round down.

Coil weight bands

Coils are grouped into weight bands in trade practice, and the band matters because it determines what handling equipment the buyer needs on arrival.

BandWeightInner diameterOuter diameterTypical use
Light3 – 8 t508 / 610 mm1,000 – 1,400 mmSmall processing lines, small-batch work, limited crane capacity
Medium8 – 15 t508 / 610 mm1,200 – 1,600 mmMost stamping and roll-forming plants — the most common band
Heavy15 – 20 t508 / 610 mm1,400 – 1,800 mmLarge automated lines that change coils infrequently
Extra heavy (HRC)20 – 28 t610 mm1,600 – 2,000 mmPipe mills and heavy fabrication, fed by high-capacity decoilers

Heavy coils of 20 tonnes and above are becoming more common for pipe mills, where high-capacity decoilers can handle them and the payoff is fewer coil changes per shift. For buyers with a standard decoiler, an 8 to 15 tonne coil is usually the practical choice.

Weight per metre of strip

This is the fastest way to check a coil. Multiply thickness, width and the constant 7.85 to get kilograms per metre.

Thickness0.30 mm0.50 mm0.80 mm1.00 mm1.50 mm2.00 mm3.00 mm
Width 1000 mm (kg/m)2.363.936.287.8511.7815.7023.55
Width 1250 mm (kg/m)2.944.917.859.8114.7219.6329.44
Weight per 1000 m (t)2.364.917.859.8114.7219.6329.44

Calculated at a carbon steel density of 7.85 g/cm³. Galvanized coils carry roughly 3% more because of the zinc coating, and pre-painted coils add the paint film on top.

Coil weight calculator

Enter the coil dimensions below to calculate the theoretical coil weight and how many coils fit a container by weight.

Coil weight & container loading calculator

—
theoretical coil weight (net steel)
Gross weight per coil incl. packaging—
Strip length on coil—
Coils per container by weight—
Total gross weight loaded—

Theoretical figures only. Actual weight differs by roughly 0.5% from thickness and density tolerance plus the packaging allowance shown. Always plan loading against the weighed weight on the mill weight certificate and the packing list. Space limits, door height and floor load still need to be checked separately — see the loading table below.

Container loading limits

ContainerPayloadInternal dimensions (L × W × H)Typical coil planWatch out for
20GP~28.2 t5,898 × 2,352 × 2,393 mm4 × 7 t (typical)Check door opening height — keep coil OD at least 100 mm below the door height of 2,280 mm
40HQ~26.5–28 t (space-limited)12,032 × 2,352 × 2,698 mm3 × 8.5 t or 5 × 5.2 tLarger volume but weight stays the binding constraint for dense steel coils
40GP~28 t12,032 × 2,352 × 2,393 mmSpace-limited for coilsUseful when coil OD is small enough to stack two layers

Two constraints catch buyers regularly. The first is the door opening: a standard 20GP door is 2,280 mm high, so a coil with a 2,200 mm outer diameter leaves only 80 mm of clearance, which is not enough. Keep the outer diameter at least 100 mm below the door height. The second is floor loading: a 20GP floor carries roughly 4.0 tonnes per square metre, so a 10-tonne coil on a 1.5 m² footprint exerts 6.7 tonnes per square metre and needs spreader beams or additional dunnage.

On space: coils are normally stowed on their sides in cradles or on end, and the number of layers depends on how much of the container height the outer diameter consumes — for most steel coils only one layer is geometrically possible. For dense steel shipments the weight limit binds first; the space limit only takes over for small-diameter light coils or in a 40HQ.

Avoiding weight disputes

Weight disputes at the destination are common and entirely avoidable. Three things need to be settled in the contract before the order is placed:

  • The weighing basis — actual gross weight, net theoretical weight, or mill-certified weight. State which one governs the invoice.
  • The weighing point — mill scale, weighbridge at the works, or the destination terminal. These can differ by enough to matter on a 25-tonne load.
  • Packaging weight treatment — state the packaging allowance separately from the steel weight so a packing difference cannot be argued as a steel difference.

Then verify before sailing: check the mill weight certificate against the packing list, and make sure the packing list shows the actual weighed weight for each individual coil rather than an average across the shipment. When we supply, every coil carries its own weight on the packing list and the certificate is matched to the heat number, so the two can be reconciled at the terminal without ambiguity.

Frequently asked questions

How do I calculate the weight of a steel coil?

Use W (kg) = (π ÷ 4) × (OD² − ID²) × Width(m) × 7,850 with OD and ID in metres. For example a coil with OD 1.2 m, ID 0.508 m and width 1.25 m weighs about 9,150 kg before packaging. A quicker sanity check is weight per metre of strip: thickness (mm) × width (mm) × 7.85 ÷ 1000, multiplied by the strip length.

Why is the actual weight different from the calculated weight?

Calculated weight is theoretical. The real figure differs by roughly 0.5% from thickness and density tolerance, and a further 50–200 kg per coil from packaging — VCI paper, waterproof film, outer steel sheet wrapping, edge protectors and four to seven steel straps. Add the oil film for surface-treated material. The invoiced weight is normally the actual scale weight at the mill or the mill-certified weight, and that is the figure to plan loading against.

What is the maximum coil weight I can put in a 20GP?

The payload limit of a standard 20GP is about 28.2 tonnes, but the practical limit for steel coils is 22–24 tonnes once lashing and weight distribution are taken into account. Overloading is both illegal and dangerous. Underloading raises your freight cost per tonne, so it is worth planning the coil count before the mill cuts the order.

Can steel coils be stacked in a container?

Only when the coils have identical outer diameters and are placed in purpose-built cradles. For mixed coil sizes, single-layer loading is mandatory. A second constraint that buyers often miss is the container floor load limit of roughly 4.0 tonnes per square metre — a 10-tonne coil sitting on a 1.5 m² footprint exerts 6.7 tonnes per square metre and needs spreader beams or additional dunnage to distribute the load.

What coil weight should I specify for my line?

Read your equipment manual for three limits: the mandrel inner diameter, the maximum coil weight the mandrel will take, and the maximum outer diameter the line can rotate. A line built for 508 mm ID and 8 tonnes will not run a 610 mm ID 15-tonne coil, and an oversized outer diameter causes the strip to rub or the coil to become unstable on the mandrel. Give the mill all three numbers so the coil is designed to fit.

How do I avoid a weight dispute at the destination?

Agree the weighing basis in the contract: actual gross weight versus net theoretical weight, and the weighing point — mill scale, weighbridge at the works, or the destination terminal. State the packing weight separately from the steel weight so that a packaging allowance cannot be disputed as steel. Then verify the mill weight certificate against the packing list before the vessel sails.